Races

La Mision

ArgentinaFebruary

Argentina, February. 160 km on 75% trail. +10,454 ft of climbing. 72 hours cutoff.

99 mi+10,454 ft-10,811 ft72 hours995 ft to 1,555 fttech 5/10Checkpoints per race bookWSER qualifierFebruary
Distance99 mi
Gain+10,454 ft
Loss-10,811 ft
Altitude995 ft to 1,555 ft
Technicality5/10
Air40°F to 80°F
Gradient profileOfficial race GPX
  • Start1,394 ft
  • High1,555 ft
  • Low995 ft
  • Finish1,037 ft

Geometryderived

Steepest drop541 ft-4.9% over 2.1 mi
Night miles36 misunset near 19:00 local

The cruxPatagonia wind, river crossings, and long dirt road connectors (near mile 65)

Course DNA

The Course

La Mision runs 160 km through Argentina. +10,454 ft gain and -10,811 ft loss. Surfaces skew 75% trail / 20% dirt road / 5% paved. Patagonia wind, river crossings, and long dirt road connectors. High point near 1,555 ft. Low near 995 ft. February temps run 40°F to 80°F. The course rewards patience early and punishes rushed descents after mile 50.

The Work

Train for 10,454 feet of climbing across 160 km. Back-to-back long runs on trail. Practice power-hiking grades above 15 percent. 72 hours total means limited margin: rehearse fueling every 45 to 60 minutes and downhill eccentric work weekly. Technicality 5/10. Build a block that simulates the crux near mile 65.

Kit

February in Argentina: plan for 40°F to 80°F. Mandatory shell if rain is in forecast. Headlamp with spare batteries if 72 hours pushes past dark. Poles help on sustained climbs above mile 25. Vest capacity for 2 liters minimum. Shoes matched to 75% trail: lugs for mud, rock plate if the course turns technical after mile 50.

Race Day

Hold effort through mile 25. The field often splits on the first big climb after mile 50. Patagonia wind, river crossings, and long dirt road connectors near mile 65 is where time is won or lost. Walk the steep pinches. Run the flats and gentle downhills. Crew at major aids: socks, calories, ice if hot. Transitions under 5 minutes when possible. Final third is 33 miles of fatigue management. Finish with reserve for the last descent.

La Mision