Races

Mt. Fuji 100

JapanApril

Japan, April. 100 mi on 75% trail. +1,980 ft of climbing. 46 hours cutoff.

100 mi+1,980 ft-1,977 ft46 hours57 ft to 121 fttech 5/10Checkpoints per race bookWSER qualifierApril
Distance100 mi
Gain+1,980 ft
Loss-1,977 ft
Altitude57 ft to 121 ft
Technicality5/10
Air50°F to 85°F
Gradient profileOfficial race GPX
  • Start66 ft
  • High121 ft
  • Low57 ft
  • Finish69 ft

Geometryderived

Steepest drop56 ft-0.5% over 2.1 mi
Night miles42 misunset near 18:00 local

The cruxFive lakes loops and the long paved connectors at altitude (near mile 65)

Course DNA

The Course

Mt. Fuji 100 runs 100 mi through Japan. +1,980 ft gain and -1,977 ft loss. Surfaces skew 75% trail / 20% dirt road / 5% paved. Five lakes loops and the long paved connectors at altitude. High point near 121 ft. Low near 57 ft. April temps run 50°F to 85°F. The course rewards patience early and punishes rushed descents after mile 50.

The Work

Train for 1,980 feet of climbing across 100 mi. Back-to-back long runs on trail. Practice power-hiking grades above 15 percent. 46 hours total means limited margin: rehearse fueling every 45 to 60 minutes and downhill eccentric work weekly. Technicality 5/10. Build a block that simulates the crux near mile 65.

Kit

April in Japan: plan for 50°F to 85°F. Mandatory shell if rain is in forecast. Headlamp with spare batteries if 46 hours pushes past dark. Poles help on sustained climbs above mile 25. Vest capacity for 2 liters minimum. Shoes matched to 75% trail: lugs for mud, rock plate if the course turns technical after mile 50.

Race Day

Hold effort through mile 25. The field often splits on the first big climb after mile 50. Five lakes loops and the long paved connectors at altitude near mile 65 is where time is won or lost. Walk the steep pinches. Run the flats and gentle downhills. Crew at major aids: socks, calories, ice if hot. Transitions under 5 minutes when possible. Final third is 33 miles of fatigue management. Finish with reserve for the last descent.

Mt. Fuji 100